Liugong Emission Reduction Plan

    Description
    Description
    Until 2015, the following emission reduction objects will be acheived:

    Reduce chemical oxygen demand (COD) emission in waste water by 55 tons per year

    Reduce paint slag emission by 120 tons per year.

    Reduce SO2 and oxynitride emission by 20 tons per year and 30 tons per year respectively.

    In electroplating procedure, achieve zero emission of waste water and reduce emission of chromium electroplating sludge by 80%, i.e. 40 tons per year.
    Implementation of the Project/Activity

    Use waste water treatment station to reuse waste water for production and greening.
    Apply new coating technology “powder painting”
    Remold the established coal-fired boiler and replace coal by sawdust.
    Introduce wastewater reclamation technology: collating-ultrafiltration-sterilization three level combination technologies. The waste water is reused to the production process after the treatment.
    Introduce new equipment and chromium electroplating wastewater treatment technology: use electrochemical methods-ultrafiltration-reverse osmosis combination technology. The waste water is reuse to the production process without emission.

    N/A
    Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
    Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
    Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
    Staff / Technical expertise
    New technology, R&D team, sustainable development team and Technical Managers in Business Units
    No progress reports have been submitted. Please sign in and click here to submit one.
    False
    Action Network
    Rio+20
    This initiative does not yet fulfil the SMART criteria.
    Share
    FacebookTwitterLinkedIn
    Timeline
    31 March 2015 (date of completion)
    Entity
    N/A
    Goals
    N/A
    Geographical coverage
    Liuzhou, China
    More information
    Countries
    N/A
    Contact Information

    Huayi Lin, Strategic planning specialist