Electronic information exchange and use of electronic CIM/SMGS Consignment Note at selected railway routes of TRACECA corridor
Focus Areas
Description & Planned Activities
PS IGC TRACECA supports promotion of the use of combined CIM/SMGS Consignment note (CN) developed by OSJD and CIT due to potential to streamline procedures at reconsignment points along railway routes where the transport regimes change between SMGS (under OSJD SMGS Agreement) and CIM (under COTIF Convention). Under coordination of PS IGC TRACECA a joint pilot project on use of electronic CIM/SGS CN was initiated with support from OSJD and CIT and the guidance based on the CIM/SMGS Consignment Note Manual (GLV-CIM/SMGS) and Specifications for the electronic CIM/SMGS consignment note (2019). The UN ECE (UN/CEFACT experts) support is provided for alignment of e-CIM/SMGS CN messages with UN/CEFACT standards. The joint pilot project was launched in May 2023 with signing of MoU between the railway operators in Azerbaijan, Georgia, Kazakhstan, Türkiye, and Ukraine on the organization of joint pilot project(s) for the use of electronic CIM/SMGS consignment notes along selected TRACECA routes. Moldova joined the pilot project activities in 2025. The objectives of the pilot project are to review the legal environment; to analyze operational and organizational issues; and to test technical solutions for implementation of e-CIM/SMGS CN. The concept of testing e-CIM/SMGS CN under the pilot project is based on the decentralized use of existing railway IT systems in participating countries. There is no intention to develop new systems, but only to connect the existing IT railway systems. Since launch, the project has convened 4 Working Group meetings and 12 technical consultations of IT experts (June 2023–December 2025). These discussions shaped the prototype, testing protocols, and draft Agreement for regular use of eCIM/SMGS CN in future. A digital prototype (XML schema, XSD structure) was developed in 2024 and tested through 4 virtual exercises (June 2024, September–October 2024, May & November 2025). Several countries piloted and achieved integration of IT systems based on API based electronic exchanges. In parallel, a draft multilateral Agreement regulating e-CIM/SMGS CN use has been circulated since late 2024, with successive revisions in 2025 and further consultations planned for early 2026. Upcoming priorities include API development remaining countries and deployment of XML/EDIFACT converters. A high-level meeting in mid-2026 May is envisaged to mark the transition from pilot to regular implementation (if participating countries agree and sign the Agreement).
Monitoring of Progress
Partnership Details